Direct Answer
**The earthing resistance passes every year, so why does lightning still damage the low-voltage (LV) equipment? The answer: a passing steady-state earthing resistance only means good power-frequency dissipation — it does not mean the transient counterattack and equipotential bonding are sufficient. LV equipment damage usually comes from the potential difference caused by the earth-potential rise, missing equipotential bonding at zone boundaries, or no SPD on the signal/power paths. The diagnosis must expand from "the earthing resistance" to the equipotential continuity and the cross-zone SPD coordination, instead of only measuring the resistance.**
At a park, the earthing resistance passed every year, but the LV equipment was still damaged by surges in the storm season. Measuring only the resistance could not explain it; after expanding the diagnosis, it was found that there was no equipotential bonding at the cabinet-tray zone boundary — when the earth potential rose during a strike, the potential difference between the two sides was large, and the surge entered through the signal lines. After adding cross-zone bonding and signal-line SPDs, there was no more damage. **The key distinction: a passing resistance is not transient safety — the root causes of LV damage are mostly equipotential continuity and cross-zone coordination; the diagnosis must expand from the resistance to these two.**
Why:
- **The resistance dimension**: a passing steady state only means good power-frequency dissipation; - **Equipotential bonding**: is the continuity/cross-zone interface sufficient; - **SPD coordination**: are the power and signal paths protected; - **The diagnosis**: resistance → equipotential → SPD coordination.
Key insight: **"A passing resistance is not transient safety — for LV damage, check the equipotential continuity and cross-zone SPD coordination; do not stare only at the resistance value."**
At a plant, an LV box beside the down-conductor was damaged by a strike even though the resistance passed; the cause was insufficient clearance and no equipotential bonding with the down-conductor, so the current path counterattacked the LV equipment. Adding the equipotential connection fixed it. **Lesson: a passing resistance is only the baseline — the potential difference from the earth-potential rise is the real enemy of LV equipment.**
1. A Passing Steady-State Resistance Is Not Transient Safety
Step one: why it still breaks even when it passes.
**Steady state vs transient**: - The steady-state resistance measures the power-frequency dissipation; - The transient looks at the potential rise under the lightning current; - The two are not the same; - A passing resistance is not transient safety.
**Why a potential difference appears**: - The earth potential rises the moment the lightning current enters the ground; - The rise amplitude differs at different points; - A potential difference forms between the devices; - The difference drives a surge current into the equipment.
**The misconception**: - "A passing resistance means safe"; - Measuring only the resistance, not the bonding; - Cannot explain why the equipment broke; - No direction for rectification.
Key insight: **"A passing steady-state resistance only means good power-frequency dissipation — the potential difference from the earth-potential rise is the main cause of LV damage; do not treat a pass as an immunity certificate."**
2. Is the Equipotential Continuity and the Cross-Zone Interface Complete
Step two: check the potential-difference channels.
**Check the equipotential continuity**: - Are the cabinets/trays/shielding all bonded; - Are the connection points reliable (connecting to KD-0187); - Are new metal bodies brought in; - The continuity decides whether the potential is one.
**Check the cross-zone interfaces**: - The lightning-protection-zone (LPZ) boundaries (connecting to KD-0165); - The entering/exiting pipes and cables across the zones; - Is the bonding done at the interface; - Missing bonding → the potential-difference entrance.
**Common misses**: - The tray and the cabinet not connected; - No bonding busbar at the cross-zone interface; - Signal lines/shielding not bonded; - New pipes not brought in.
Key insight: **"Check the equipotential continuity and the cross-zone interface — all cabinets/trays bonded, bonding at the interfaces; one miss is a potential-difference entrance."**
3. Are the Power and Signal Path SPDs in Place
Step three: check the surge entrances.
**The power path**: - An SPD at the distribution entry (connecting to KD-0161); - Protection of the LV equipment power; - A missing power SPD → the surge enters through the power; - Configure by LPZ stages.
**The signal path**: - Signal/data/control lines; - Matching signal SPDs; - Surges often enter through the signal lines; - The signal path is the easiest to ignore.
**The coordination principle**: - Both the power and the signal need SPDs; - Select by the path characteristics; - The signal SPD coordinates with the power SPD; - Focus protection on the interfaces.
Key insight: **"Check the power and signal path SPDs — LV surges often enter through the signal lines; protecting both the power and the signal is complete protection."**
4. Is the Earthing Grid Equalization Insufficient
Step four: check the grid itself.
**The equalization role of the grid**: - The equalization net makes the potential rise consistent during a strike; - The grid area/mesh affects the equalization; - Insufficient equalization → a large local potential difference; - A grid retrofit improves the equalization.
**How to check**: - The grid mesh density; - Local grids in the equipment areas; - Whether independent earthing is merged (counterattack prevention); - The equalization net connected to the main grid.
**Common problems**: - Too large a grid mesh; - No local equalization in the equipment areas; - Independent earthing not merged; - A large local potential difference on a strike.
Key insight: **"Check the grid equalization — a dense mesh, local equalization, merged independent earthing; the potential rise is consistent and the difference is small."**
5. The Diagnosis Order: Resistance → Equipotential → SPD Coordination
Step five: check in order.
**The diagnosis order**: - ① The resistance: a pass is only the baseline (measured by the FR); - ② Equipotential: continuity + cross-zone interface; - ③ SPD coordination: the power + signal paths; - ④ Grid equalization: mesh/local/merging; - Check in order and record the data.
**The treatments**: - A large difference → add bonding; - A missing interface → do the cross-zone bonding; - A missing path → add the power + signal SPDs; - Poor equalization → denser mesh/local equalization.
**Practice verification**: - Review after the retrofit in the storm season; - The FR monitor + the FS SPD monitor; - Event records closed; - No more damage means it is good.
Key insight: **"Diagnose in order: resistance (baseline) → equipotential (continuity/interface) → SPD coordination (power/signal) → grid equalization — treat the cause and verify by monitoring after the retrofit."**
6. Product Implementation: Monitoring and Diagnosis as One
WeiWuLian products manage LV protection:
- **FR Earth-Resistance Monitor**: online resistance and earthing state; - **FS SPD Monitor**: online SPD state/events; - **Equipotential check**: continuity/interface data; - **Closed-loop diagnosis**: resistance-bonding-SPD data.
The design principle in one sentence: **"Resistance is the baseline, bonding is the main battlefield, SPD is the entrance — a three-dimensional data loop; LV protection no longer relies on guessing."**
7. Common Misjudgments
1. **"A passing resistance means safe"**: ignoring the transient. Result: damage from the potential difference. Correct: expand the diagnosis to the bonding. 2. **"Measure only the resistance"**: ignoring the bonding. Result: no root cause found. Correct: resistance → bonding → SPD. 3. **"Only the power SPD"**: ignoring the signal path. Result: the surge enters through the signal lines. Correct: protect both. 4. **"No bonding across the zones"**: ignoring the interface. Result: a potential-difference entrance. Correct: bond the interface. 5. **"Independent earthing is fine"**: ignoring the equalization. Result: a large local difference. Correct: merge/local equalize.
Scope and Limitations
This article explains the diagnosis of the counter-intuitive "passing resistance but damaged LV equipment" failure (steady vs transient, equipotential continuity, cross-zone interfaces, power/signal SPD coordination, grid equalization and the diagnosis order), applicable to troubleshooting and understanding LV lightning damage. The exact parameters and requirements follow GB 50057-2010, GB 50343-2012 and the manufacturers' data; this article explains only the diagnostic logic and judgment basis. All cases are anonymized (a park, a plant) and do not refer to any specific customer.