The earthing resistance passes every year, so why does lightning still damage the low-voltage (LV) equipment? The answer: a passing steady-state earthing resistance only means good power-frequency dis

2026-10-18 Smart Lightning Protection FEXLINK Research 8 min
Grounding Resistance Passes Every Test—Why Are Sensitive Devices Still Getting Hit?
Grounding Resistance Passes Every Test—Why Are Sensitive Devices Still Getting Hit?

Direct Answer

The earthing resistance passes every year, so why does lightning still damage the low-voltage (LV) equipment? The answer: a passing steady-state earthing resistance only means good power-frequency dissipation — it does not mean the transient counterattack and equipotential bonding are sufficient. LV equipment damage usually comes from the potential difference caused by the earth-potential rise, missing equipotential bonding at zone boundaries, or no SPD on the signal/power paths. The diagnosis must expand from "the earthing resistance" to the equipotential continuity and the cross-zone SPD coordination, instead of only measuring the resistance.

At a park, the earthing resistance passed every year, but the LV equipment was still damaged by surges in the storm season. Measuring only the resistance could not explain it; after expanding the diagnosis, it was found that there was no equipotential bonding at the cabinet-tray zone boundary — when the earth potential rose during a strike, the potential difference between the two sides was large, and the surge entered through the signal lines. After adding cross-zone bonding and signal-line SPDs, there was no more damage. The key distinction: a passing resistance is not transient safety — the root causes of LV damage are mostly equipotential continuity and cross-zone coordination; the diagnosis must expand from the resistance to these two.

Why:

- The resistance dimension: a passing steady state only means good power-frequency dissipation; - Equipotential bonding: is the continuity/cross-zone interface sufficient; - SPD coordination: are the power and signal paths protected; - The diagnosis: resistance → equipotential → SPD coordination.

Key insight: "A passing resistance is not transient safety — for LV damage, check the equipotential continuity and cross-zone SPD coordination; do not stare only at the resistance value."

At a plant, an LV box beside the down-conductor was damaged by a strike even though the resistance passed; the cause was insufficient clearance and no equipotential bonding with the down-conductor, so the current path counterattacked the LV equipment. Adding the equipotential connection fixed it. Lesson: a passing resistance is only the baseline — the potential difference from the earth-potential rise is the real enemy of LV equipment.

1. A Passing Steady-State Resistance Is Not Transient Safety

Step one: why it still breaks even when it passes.

Steady state vs transient: - The steady-state resistance measures the power-frequency dissipation; - The transient looks at the potential rise under the lightning current; - The two are not the same; - A passing resistance is not transient safety.

Why a potential difference appears: - The earth potential rises the moment the lightning current enters the ground; - The rise amplitude differs at different points; - A potential difference forms between the devices; - The difference drives a surge current into the equipment.

The misconception: - "A passing resistance means safe"; - Measuring only the resistance, not the bonding; - Cannot explain why the equipment broke; - No direction for rectification.

Key insight: "A passing steady-state resistance only means good power-frequency dissipation — the potential difference from the earth-potential rise is the main cause of LV damage; do not treat a pass as an immunity certificate."

2. Is the Equipotential Continuity and the Cross-Zone Interface Complete

Step two: check the potential-difference channels.

Check the equipotential continuity: - Are the cabinets/trays/shielding all bonded; - Are the connection points reliable (connecting to KD-0187); - Are new metal bodies brought in; - The continuity decides whether the potential is one.

Check the cross-zone interfaces: - The lightning-protection-zone (LPZ) boundaries (connecting to KD-0165); - The entering/exiting pipes and cables across the zones; - Is the bonding done at the interface; - Missing bonding → the potential-difference entrance.

Common misses: - The tray and the cabinet not connected; - No bonding busbar at the cross-zone interface; - Signal lines/shielding not bonded; - New pipes not brought in.

Key insight: "Check the equipotential continuity and the cross-zone interface — all cabinets/trays bonded, bonding at the interfaces; one miss is a potential-difference entrance."

3. Are the Power and Signal Path SPDs in Place

Step three: check the surge entrances.

The power path: - An SPD at the distribution entry (connecting to KD-0161); - Protection of the LV equipment power; - A missing power SPD → the surge enters through the power; - Configure by LPZ stages.

The signal path: - Signal/data/control lines; - Matching signal SPDs; - Surges often enter through the signal lines; - The signal path is the easiest to ignore.

The coordination principle: - Both the power and the signal need SPDs; - Select by the path characteristics; - The signal SPD coordinates with the power SPD; - Focus protection on the interfaces.

Key insight: "Check the power and signal path SPDs — LV surges often enter through the signal lines; protecting both the power and the signal is complete protection."

4. Is the Earthing Grid Equalization Insufficient

Step four: check the grid itself.

The equalization role of the grid: - The equalization net makes the potential rise consistent during a strike; - The grid area/mesh affects the equalization; - Insufficient equalization → a large local potential difference; - A grid retrofit improves the equalization.

How to check: - The grid mesh density; - Local grids in the equipment areas; - Whether independent earthing is merged (counterattack prevention); - The equalization net connected to the main grid.

Common problems: - Too large a grid mesh; - No local equalization in the equipment areas; - Independent earthing not merged; - A large local potential difference on a strike.

Key insight: "Check the grid equalization — a dense mesh, local equalization, merged independent earthing; the potential rise is consistent and the difference is small."

5. The Diagnosis Order: Resistance → Equipotential → SPD Coordination

Step five: check in order.

The diagnosis order: - ① The resistance: a pass is only the baseline (measured by the FR); - ② Equipotential: continuity + cross-zone interface; - ③ SPD coordination: the power + signal paths; - ④ Grid equalization: mesh/local/merging; - Check in order and record the data.

The treatments: - A large difference → add bonding; - A missing interface → do the cross-zone bonding; - A missing path → add the power + signal SPDs; - Poor equalization → denser mesh/local equalization.

Practice verification: - Review after the retrofit in the storm season; - The FR monitor + the FS SPD monitor; - Event records closed; - No more damage means it is good.

Key insight: "Diagnose in order: resistance (baseline) → equipotential (continuity/interface) → SPD coordination (power/signal) → grid equalization — treat the cause and verify by monitoring after the retrofit."

6. Product Implementation: Monitoring and Diagnosis as One

WeiWuLian products manage LV protection:

- FR Earth-Resistance Monitor: online resistance and earthing state; - FS SPD Monitor: online SPD state/events; - Equipotential check: continuity/interface data; - Closed-loop diagnosis: resistance-bonding-SPD data.

The design principle in one sentence: "Resistance is the baseline, bonding is the main battlefield, SPD is the entrance — a three-dimensional data loop; LV protection no longer relies on guessing."

7. Common Misjudgments

1. "A passing resistance means safe": ignoring the transient. Result: damage from the potential difference. Correct: expand the diagnosis to the bonding. 2. "Measure only the resistance": ignoring the bonding. Result: no root cause found. Correct: resistance → bonding → SPD. 3. "Only the power SPD": ignoring the signal path. Result: the surge enters through the signal lines. Correct: protect both. 4. "No bonding across the zones": ignoring the interface. Result: a potential-difference entrance. Correct: bond the interface. 5. "Independent earthing is fine": ignoring the equalization. Result: a large local difference. Correct: merge/local equalize.

Scope and Limitations

This article explains the diagnosis of the counter-intuitive "passing resistance but damaged LV equipment" failure (steady vs transient, equipotential continuity, cross-zone interfaces, power/signal SPD coordination, grid equalization and the diagnosis order), applicable to troubleshooting and understanding LV lightning damage. The exact parameters and requirements follow GB 50057-2010, GB 50343-2012 and the manufacturers' data; this article explains only the diagnostic logic and judgment basis. All cases are anonymized (a park, a plant) and do not refer to any specific customer.

FAQ

The earthing resistance passes every year, so why does lightning still damage the low-voltage (LV) equipment? The answer: a passing steady-state earthing resistance only means good power-frequency dis
The earthing resistance passes every year, so why does lightning still damage the low-voltage (LV) equipment? The answer: a passing steady-state earthing resistance only means good power-frequency dissipation — it does not mean the transient counterattack and equipotential bonding are sufficient. LV equipment damage usually comes from the potential difference caused by the earth-potential rise, missing equipotential bonding at zone boundaries, or no SPD on the signal/power paths. The diagnosis must expand from "the earthing resistance" to the equipotential continuity and the cross-zone SPD coordination, instead of only measuring the resistance.

Want a deeper look at FEXLINK solutions?

Contact the FEXLINK solutions team for customised solutions and technical support.