Demand Response Execution and Effect Verification Solutions

Demand response execution must distinguish three modes: monitoring, prompting and actual control. FECB2P and FECM2 can provide confirmed load control and aggregation capability, CW handles field aggregation, and FEXLINK records commands, execution, baselines, actual load and anomalies. Control actions require authorization, safety interlocks and fallback testing, and effect verification must also exclude production changes and equipment anomalies.

OVERVIEW

Demand response execution must distinguish three modes: monitoring, prompting and actual control. FECB2P and FECM2 can provide confirmed load control and aggregation capability, CW handles field aggregation, and FEXLINK records commands, execution, baselines, actual load and anomalies. Control actions require authorization, safety interlocks and fallback testing, and effect verification must also exclude production changes and equipment anomalies.

The solution focuses on the evidence chain between command and response, not on showing a single power curve.

Energy DataDemand Response Verification
Demand Response Execution and Effect Verification Solutions
BEFORE / AFTER

Before retrofit → With the solution

Before retrofit

  • After a command is dispatched, load changes and baseline comparisons are missing
  • Response execution, manual intervention and equipment anomalies have no common timeline
  • Control authority and safety fallback have no auditable records

With the solution

  • Extends demand response from command records to verifiable execution
  • Helps reveal non-responding devices, response deviations and safety boundary issues
  • Provides a basis for operational review and later resource allocation
EFFECT ANALYSIS

How to evaluate the effect

01

Measurable signal

ESA or confirmed metering data reflects the participating loads and the baseline.

02

Data source

FECB2P Smart Circuit Breaker (Load Switching & Metering) · FECM2 Multi-Loop Smart Breaker Data Aggregator

03

Review method

Participating resources, devices and circuits are mapped completely

04

Acceptance boundary

No fixed response volume, completion rate or revenue can be committed

STANDARDS

Applicable standards

Standards and protocols are listed for project applicability review; the final clause set and edition follow the project location, industry and contract.

Demand response rules and baseline methods are confirmed against the region and projectLV control and protection requirements follow applicable standardsCommand formats, permissions and fallback processes are frozen before the pilot
ACCEPTANCE

Acceptance and boundaries

  • Participating resources, devices and circuits are mapped completely
  • Command, execution and status times are traceable
  • Actual load changes and the baseline use the same definition
  • Non-execution, partial execution and manual intervention have recorded reasons
  • Safety fallback and anomaly recovery are tested
  • Effect verification separates response actions from other operating changes
PAIN POINTS

Industry Pain Points

01

After a command is dispatched,…

After a command is dispatched, load changes and baseline comparisons are missing

02

Response execution, manual int…

Response execution, manual intervention and equipment anomalies have no common timeline

03

Control authority and safety f…

Control authority and safety fallback have no auditable records

ARCHITECTURE

Solution Architecture

Layered architecture, a complete data loop from sensing to operation.

Demand Response Execution and Effect Verification system topologyFour-layer data flow from perception and edge control to the platform and application layers for Demand Response Execution and Effect Verification.01Perception layer
ESA or confirmed metering data reflects the participating loads and the baseline.
02Edge / control layer
CW and FECM2 handle field data, and FECB2P switches loads within the authorized scope.
03Platform layer
FEXLINK builds command, execution and verification records.
04Application layer
Operations and O&M staff review response completion and anomalies.
Perception layer
ESA or confirmed metering data reflects the participating loads and the baseline.
Edge / control layer
CW and FECM2 handle field data, and FECB2P switches loads within the authorized scope.
Platform layer
FEXLINK builds command, execution and verification records.
Application layer
Operations and O&M staff review response completion and anomalies.
CORE CAPABILITIES

Core Capabilities

Product 1

FECB2P Smart Circuit Breaker (Load Switching & Metering)

Candidate load switching and metering component; capability and authorized scope are confirmed by model

Product 2

FECM2 Multi-Loop Smart Breaker Data Aggregator

Aggregates multi-circuit data and connects the control chain; interfaces and capacity are confirmed by model

Product 3

CW Edge Computing Gateway

Aggregates field data and runs project-confirmed edge rules

Product 4

FEXLINK IoT Platform

Records commands, execution, load changes, alarms and effect verification

DATA LOOP

Data Loop

The complete data value chain: sense -> data -> AI -> warning -> control -> operation.

01Site sensing
02Edge aggregation
03Platform analysis
04Alarm handling
05O&M closure
PRODUCT PORTFOLIO

Product Portfolio

Energy Data

FECB2P Smart Circuit Breaker (Load Switching & Metering)

FECB2P Smart Circuit Breaker (Load Switching & Metering)

Candidate load switching and metering component; capability and authorized scope are confirmed by model

Energy DataDemand Response Verification
Demand Response Verification

FECM2 Multi-Loop Smart Breaker Data Aggregator

FECM2 Multi-Loop Smart Breaker Data Aggregator

Aggregates multi-circuit data and connects the control chain; interfaces and capacity are confirmed by model

Energy DataDemand Response Verification
Energy Data

CW Edge Computing Gateway

CW Edge Computing Gateway

Aggregates field data and runs project-confirmed edge rules

Energy DataDemand Response Verification
Demand Response Verification

FEXLINK IoT Platform

FEXLINK IoT Platform

Records commands, execution, load changes, alarms and effect verification

Energy DataDemand Response Verification
CUSTOMER VALUE

Customer Value

Quantified, verifiable customer value.

Extends demand response fr…

Extends demand response from command records to verifiable execution

Energy DataDemand Response Verification

Helps reveal non-respondin…

Helps reveal non-responding devices, response deviations and safety boundary issues

Energy DataDemand Response Verification

Provides a basis for opera…

Provides a basis for operational review and later resource allocation

Energy DataDemand Response Verification
RELATED SOLUTIONS

Related Solutions

Maximum Demand and Peak Shaving

The solution separates demand monitoring, load control and safety authority by design, and emphasizes that control actions require dedicated confirmation.

Energy DataStatus Visualization

Virtual Power Plant Resource Aggregation

The solution provides a resource registration and data aggregation framework. It does not present a candidate product combination as existing market trading or automatic response capability.

Energy DataResource Aggregation

Local Thresholds, Alarms and Interlock Control

The solution targets sites that need fast local response and cannot depend on a cloud round trip. It focuses on alarm strategy, control logic, fail-safe behaviour, manual reset, operating authority and the division of responsibility with upper-level platforms.

Device-Edge-Cloud CollaborationClosed-Loop Alarm HandlingLocal Linkage

Compressed Air System Efficiency and Predictive Maintenance

The solution combines electrical data with compressed air process data. It addresses fragmented data and missing baselines first and does not commit to unverified fault prediction or energy savings.

Energy DataEnergy Efficiency Analysis

Pump and Fan Energy Efficiency Monitoring

The solution suits energy and operating analysis for pumps, fans and similar rotating equipment. It focuses on the equipment register, operating-condition data and baselines, and does not commit to a fixed energy saving rate.

Energy DataEnergy Efficiency Analysis

HVAC Energy Efficiency Optimization

The solution is positioned as an optimization foundation for HVAC energy and environmental data. Automatic control and energy saving results require validation in a controlled pilot.

Energy DataEnergy Efficiency Analysis
FAQ

FAQ

According to the applicable project rules, historical load and comparable operating conditions, with records of any anomaly adjustments.
Compare command time, device status and actual load, and record network, protection or manual intervention causes.
Only after devices, authority, interlocks and fallback have passed review. By default, simulation or manual confirmation comes first.
Use the baseline, actual load and event records for the same boundary and period, excluding production and environmental changes.
Fire, safety and critical process loads that must not be interrupted should not be included, and the control strategy must be explicitly constrained.
Design local protection, manual operation and status recovery strategies. Remote commands must not be the only control condition.