Field Work on Bonding Bars and Earth Mains: Welds, Anti-Corrosion and Test Points

The bonding and earth-main drawings look good, but how are the on-site welding, anti-corrosion and test points done to be qualified? The answer: the field work on bonding bars and earth mains must imp

2026-10-18 Smart Lightning Protection FEXLINK Research 8 min
Field Work on Bonding Bars and Earth Mains: Welds, Anti-Corrosion and Test Points
Field Work on Bonding Bars and Earth Mains: Welds, Anti-Corrosion and Test Points

Direct Answer

The bonding and earth-main drawings look good, but how are the on-site welding, anti-corrosion and test points done to be qualified? The answer: the field work on bonding bars and earth mains must implement three points — the lap-weld length and a full weld, anti-corrosion treatment on the welds, and earth test points reserved where easy to measure; unreliable connections are the main on-site cause of bonding failure, and the acceptance should check these three points item by item rather than looking only at the drawing.

On a project the bonding drawings were complete, but on site the lap welds were only tacked in two or three spots with cold welds, and no anti-corrosion was applied to the welds; a year later the connection points rusted, the bonding was "visually connected but not actually connected", and on a strike the potential difference between equipment hurt someone. After the rectification — full welds + anti-corrosion + reserved test points — the re-measurement passed. The key distinction: the main on-site cause of bonding failure is an unreliable connection — the lap-weld length and weld, the anti-corrosion on the welds, and the reserved test points directly decide "connected or not"; the acceptance checks these three item by item, not just the drawing.

Why:

- The lap weld: the length and the weld meet the standard, no cold welds; - Anti-corrosion: rust on the welds is the long-term failure source; - The test points: reserved where easy to measure, re-measurable and acceptable; - The on-site spot checks: the connection reliability proven by measurement.

Key insight: "An unreliable connection is the main on-site cause of bonding failure — the lap-weld length/weld, the weld anti-corrosion and the reserved test points checked one by one; not just the drawing."

At a park the earth-main welds had no anti-corrosion; three years later the welds rusted over a large area and the earth-resistance readings rose year by year. Lesson: anti-corrosion is not an option — without it on the welds, the connection eventually fails, and the bonding goes from "connected" to "not connected".

Overview: run "lap weld → anti-corrosion → test points → spot checks → acceptance evidence" as one executable acceptance sheet. For bonding bars and earth mains, the drawing is only the beginning; the on-site connection quality decides everything. An unreliable connection — cold welds, rust, no test points — is the most common on-site cause of bonding failure, and it often only exposes itself at a strike or a fault. The work and acceptance watch five points: the lap-weld length and a full weld, anti-corrosion on the welds, the reserved positions of the test points, the on-site spot checks of the connection reliability, and the measured acceptance with evidence. The five steps below expand: the lap-weld length and weld requirements, anti-corrosion on the welds and connections, the reserved positions of the test points, the on-site spot checks of the connection reliability, and the measured acceptance with evidence.

The material and tool checks before construction: check three things before starting to avoid rework. One, the material — the flat/round steel specifications, the galvanized layer, the length consistent with the design, the strip width and thickness meeting the standard; two, the welding conditions — the welder current adjustable, the electrode type matched, the operator certified, no welding in bad weather (rain/snow/wind); three, the measuring tools — an earth-resistance tester, a multimeter and a tape on site, measuring while welding. A bonding bar with unqualified material is an ineffective project even when welded well. The three pre-construction checks: the material specifications and the galvanized layer, the welding conditions and the certified operator, the measuring tools on site — with unqualified material, even good welding is an ineffective project.

1. The Lap-Weld Length and Weld Requirements

Step one: the weld is the "lifeline" of the bonding.

The lap-weld length: - The flat-steel lap length per the standard (≥ twice the width, etc.); - The round-steel lap by the diameter multiple; - Insufficient length = insufficient connection area; - The current path restricted.

The weld requirements: - A full weld, no cold welds; - Three-side/two-side welding per the standard; - No slag, no pores; - A smooth transition at the weld.

Why tack welding is not acceptable: - A small contact area; - Local overheating under the lightning current; - Insufficient mechanical strength; - The bonding is as good as not done.

Key insight: "The weld is the lifeline — the lap length per the standard (each multiple for flat/round), a full weld without cold welds; a tack weld has a small contact area and overheats under the lightning current — as good as not done."

The routing and fixing of the strip: besides the weld itself, the routing of the bonding strip also affects the effect. One, the strip follows the shortest path connecting the equipment/metal members, no detours (a detour = more impedance, a larger potential difference under the lightning current); two, the strip is fixed firmly, with even spacing, not hanging or shaking (a hanging strip may swing and loosen under the electrodynamic force of the lightning current); three, protective conduits at the wall/floor penetrations to avoid mechanical damage. The routing and fixing affect "connected or not" just as much as the weld. Routing and fixing are equally important: the strip on the shortest path, firmly fixed without hanging, conduits at the penetrations — a detour and hanging both make the connection nominal.

2. Anti-Corrosion on the Welds and Connections

Step two: anti-corrosion decides the long-term reliability.

Why anti-corrosion: - The welds are the corrosion weak points; - Rust → contact resistance rising; - The connection failing gradually; - The bonding going from "connected" to "not connected".

The anti-corrosion practice: - Derusting after welding; - Anti-corrosion paint/bituminous paint; - Enhanced anti-corrosion for the buried parts; - Anti-rust on the connecting bolts.

The acceptance checks: - The anti-corrosion coverage complete on the welds; - No bare rust points; - The buried connections treated in place; - Periodic re-coating.

Key insight: "Anti-corrosion decides the long-term reliability — the welds are the corrosion weak points and rust raises the contact resistance; derust and coat after welding, strengthen the buried parts, check the coverage complete at the acceptance."

The handling of bolted connections and detachable points: not every connection must be welded — positions that need to be opened for testing or maintenance later (e.g. test points, disconnecting clamps) use bolts, but three things must be handled: one, derust the contact surfaces and apply a conductive paste for a low contact resistance; two, add spring washers against loosening, the bolt torque up to the standard; three, the bolted connections are also protected against corrosion. The bolted-connection checks: cannot be turned by hand, the contact surface bright and rust-free, the pressed surfaces fitting. Three treatments for the bolted connections: derust the surfaces and apply a conductive paste, spring washers against loosening, anti-corrosion at the connections — cannot be turned by hand, the surface bright and rust-free to be qualified.

3. The Reserved Positions of the Test Points

Step three: what cannot be measured cannot be verified.

Why test points: - Bonding/earthing must be measurable; - Without a test point, re-measurement is impossible; - No measured basis for the acceptance; - No entry point for later maintenance.

The test-point requirements: - Reserved where easy to measure; - A visible position with labels; - The earth resistance measurable (relating to FR); - The disconnecting/test clamp per the standard.

The position selection: - Both ends of the mains and the branches; - At the building entrances; - Near important equipment; - Reachable by the measuring tools.

Key insight: "What cannot be measured cannot be verified — test points reserved where easy to measure, labelled, the earth resistance measurable (relating to FR); set at both ends of the mains, the building entrances and near important equipment."

4. The On-Site Spot Checks of the Connection Reliability

Step four: proven by measurement.

The spot-check methods: - Hand pull/tap check of the welds; - A multimeter for the connection resistance; - An earth-resistance tester for the reading; - The connection points gone through one by one.

The common disqualifications: - Cold welds/slag; - Missing anti-corrosion and rust; - Missing test points; - Loose connecting bolts.

The spot-check priorities: - All main connection points covered; - The branch points sampled; - The hidden work verified before covering; - Disqualifications reworked on the spot.

The four specific actions of the spot check: a spot check is not "a glance" but four repeatable actions. One, the tap — tap the weld lightly with a small hammer, judging a cold weld by the sound (a cold weld sounds dull, a solid one crisp); two, the pull — apply a moderate pull to the strip and the terminals, looking for looseness and displacement; three, the measure — measure the connection-point resistance with a multimeter/earth-resistance tester against the qualified value; four, the look — visually check the rust and the coverage. Go through the four actions in the "tap → pull → measure → look" order, every main point, the branch points sampled by ratio. The four spot-check actions: tap (the cold-weld sound) → pull (the looseness) → measure (against the qualified value) → look (the rust) — all main points, the branches sampled by ratio.

Key insight: "Proven by measurement — tap/pull check the welds, a multimeter measures the connection resistance, an earth-resistance tester takes the reading; cold welds, rust, missing test points and loose bolts are all disqualifications."

5. The Measured Acceptance with Evidence

Step five: the acceptance must leave evidence.

The measured contents: - The lap lengths measured against the standard; - The welds by sight and tap; - The anti-corrosion coverage checked; - The earth resistance measured and recorded.

The evidence requirements: - The measured data recorded; - Photos kept (welds/anti-corrosion/test points); - Photos of the hidden work before covering; - The test report archived.

The monitoring support: - The FR earth-resistance monitor online; - The earth changes with a trend; - Degradation found early; - Cross-verified with the off-line readings.

The "verify first, then cover" of the hidden work: earth mains are mostly buried or cast into concrete, and once hidden they cannot be seen — so the hidden work must be verified with evidence before covering, the easiest step to miss and the most costly. The principle is "verify first, then cover": before backfilling/pouring, photograph the welds, the anti-corrosion layer and the strip routing, measure and record, and only after the supervisor/owner confirms may it be covered. Missing this step, a buried bonding strip with a problem can only be dug out — at a high cost. The hidden work is verified first and covered after: photos + measurement + confirmation before backfilling, covered only when qualified — missing this step, buried problems mean digging it out and redoing.

Key insight: "The acceptance measured with evidence — the lap length/weld/anti-corrosion/earth resistance measured item by item, the data and photos archived; the FR online cross-verified with the off-line readings."

6. Product Implementation: Connection Qualified + Online

WeiWuLian products land the bonding work effect into verifiable monitoring:

- FR Earth-Resistance Monitor: the earth resistance online; - Test-point integration: the monitor connected to the reserved test points; - The construction standard landed: the weld/anti-corrosion/test point into the acceptance sheet; - The data traceable: the trend cross-verified with the off-line.

The design principle in one sentence: "An unreliable connection is the main cause of bonding failure — the lap weld, anti-corrosion and test points accepted one by one; the FR online keeps the earthing always visible and verifiable."

7. Common Understanding Misjudgments

1. "The drawing right is enough": ignoring the field. Result: cold welds/rust unknown. Correct: check the three item by item. 2. "Tack welding is convenient": ignoring the area. Result: the connection nominal. Correct: full welds. 3. "Anti-corrosion can be skipped": ignoring the rust. Result: connected becomes not. Correct: coat after welding. 4. "No test points": ignoring the measurement. Result: no re-measurement. Correct: reserve where easy to measure. 5. "Installed, done, no monitoring": ignoring the degradation. Result: failure unknown. Correct: the FR online.

Scope and Limitations

This article gives the acceptance points for the field work on bonding bars and earth mains (the lap-weld length and weld, the weld anti-corrosion, the reserved test points, the spot checks, the acceptance evidence), applicable to bonding work acceptance and checks. The specific values (lap lengths/anti-corrosion materials) follow GB 50057-2010 and the related standards; this article explains only the work-acceptance logic and the check actions. All cases are anonymized (a project, a park) and do not refer to any specific customer.

FAQ

The bonding and earth-main drawings look good, but how are the on-site welding, anti-corrosion and test points done to be qualified? The answer: the field work on bonding bars and earth mains must imp
The bonding and earth-main drawings look good, but how are the on-site welding, anti-corrosion and test points done to be qualified? The answer: the field work on bonding bars and earth mains must implement three points — the lap-weld length and a full weld, anti-corrosion treatment on the welds, and earth test points reserved where easy to measure; unreliable connections are the main on-site cause of bonding failure, and the acceptance should check these three points item by item rather than looking only at the drawing.