Direct Answer
**On design drawings, on what basis are LPZ zones drawn, and what protection is needed at each boundary crossing? The answer: LPZ zones are divided by decreasing "strike probability and electromagnetic-field strength" — LPZ0A is fully exposed (possible direct strike, field unattenuated), LPZ0B is protected by air-termination but the field is still unattenuated, entering the building gives LPZ1 (field attenuated by the structure, no direct strike possible), and deeper areas are LPZ2+; at every zone-boundary crossing, equipotential bonding and a correspondingly rated SPD must be installed to divert surge energy stage by stage.**
At one design institute, drawings marked LPZ0B/LPZ1/LPZ2, but on site only one stage of SPD was installed at the main distribution board, and weak-current equipment sat unprotected inside LPZ1. Review pointed out: weak-current equipment should be placed at least in LPZ2, with SPD + bonding at each boundary. After rectification, surge incidents dropped sharply. **Zoning core: divide by "can it be struck + how much the field is attenuated"; boundary = SPD + bonding installation position — the deeper the zone, the higher the protection requirement.**
Because:
- **Two criteria**: strike possibility + field attenuation; - **0A vs 0B**: differ in whether air-termination protects; - **Entering the building = entering LPZ1**: field attenuated by structure; - **Every boundary needs protection**: bonding + correspondingly rated SPDs divert energy stage by stage.
Key insight: **"what you do at the boundary" matters more than "what the symbol is called."** Every boundary crossing is an SPD and bonding installation position.
At one park, equipment in a machine room was damaged after the thunderstorm season; inspection found the drawings only marked zones with no boundary protection — the main SPD fed weak-current equipment directly (missing the LPZ1→LPZ2 interface). Rectification: add a second-stage SPD + bonding bar at the room entrance. **Lesson: zoning is not drawing symbols; it is protection actions at every boundary — missing one boundary misses one protection stage.**
1. The Two Criteria for LPZ Zoning
Step one: on what basis are boundaries drawn.
**Criterion 1: strike possibility**: - LPZ0 class: direct strike possible (exposed); - LPZ1 and deeper: direct strike impossible (screened by structure); - Basis: the protection range of air-termination devices; - Strike possible → need air-termination + down-conductors (building level).
**Criterion 2: electromagnetic-field attenuation**: - 0 class: field unattenuated (external field); - LPZ1: attenuated by structural shielding (partial); - LPZ2: further attenuation (finer shielding); - Basis: structural shielding capability (reinforcement/metal enclosures).
**What the two criteria determine**: - Strike possible → air-termination protection (building level); - Insufficient field attenuation → shielding + bonding (space level); - Zone boundary → SPD + bonding (line level); - Three protection layers correspond to the two criteria.
Key insight: **"the strike criterion governs air-termination; the attenuation criterion governs shielding" — the two criteria correspond to two protection classes.** Zoning is not guesswork; it follows the two criteria.
2. The Key Difference Between 0A and 0B
Step two: zone 0 is split in two.
**LPZ0A (fully exposed)**: - Direct strike possible; - Electromagnetic field completely unattenuated; - Typical positions: roofs, tower tops, open ground; - Protection: air-termination devices (SPDs cannot block direct strikes).
**LPZ0B (protected by air-termination)**: - Within the air-termination protection range; - Direct strike impossible (protected by mesh/rods); - But the field is still unattenuated; - Typical position: roof equipment under the air-termination mesh.
**The difference**: - Differs in "whether air-termination protects"; - Same: field unattenuated; - 0A needs air-termination (against direct strikes); - 0B needs none (already protected) but must guard against induction.
Key insight: **"0A guards against direct strikes; 0B guards against induction" — the same zone has two halves with different priorities.** 0B equipment looks "safe," but field damage still occurs.
3. Why Zone Boundaries Are the SPD and Bonding Installation Positions
Step three: what goes on the boundary.
**The meaning of zone boundaries**: - Points of field-strength step change (attenuation steps); - Points where surge energy must be diverted stage by stage; - Connection points where potential must be equalized; - Boundaries where protection ratings must match.
**What to do at the boundary**: - Equipotential bonding (equalize conductors crossing zones); - Install SPDs (matching rating and discharge capacity); - Shielding continuity (shield layers grounded across zones); - Standard cabling (treatment where cables cross boundaries).
**Why stage by stage**: - One-time discharge carries too much energy (equipment cannot withstand); - Stage-by-stage diversion (energy decreases to equipment tolerance); - Inter-stage coordination (upstream acts first, downstream does not trip randomly); - Protection-range continuity (no protection blind spots).
Key insight: **"boundary = bonding + SPD installation position" — install one stage per boundary crossed.** Miss one boundary, miss one protection stage.
4. A Building Section Stacking Zones, Air-Termination, Down-Conductors, and SPDs
Step four: look at it in combination.
**Section elements**: - Air-termination devices: roof (protecting the 0B zone); - Down-conductors: along the building (entry path); - Earthing grid: at the bottom (current discharge); - Zones: 0A (outside) → 0B (under air-termination) → 1 (indoor) → 2 (core).
**Section mapping**: - 0A: exposed area above the roof; - 0B: roof equipment under the air-termination mesh; - LPZ1: indoor (attenuated by structural shielding); - LPZ2: machine room/core equipment (further shielding); - Boundaries: SPD + bonding at the entrance and room entrance.
**Protection stacking**: - Building level: air-termination + down-conductors + earthing (against direct strikes); - Space level: shielding + zoning (against induction); - Line level: boundary SPDs (against wave invasion); - Three levels stacked = complete lightning-protection system.
Key insight: **"the section = zones + air-termination + down-conductors + SPDs in one drawing."** Design with the four elements stacked; protection then leaves no gaps.
5. Zoning Design vs. GB 50343 Electronic-Information-System Classification
Step five: how the code maps.
**GB 50343 classification**: - Classify electronic-information systems by importance (A/B/C levels); - Corresponding protection requirements; - Level A (critical systems) requires higher protection; - Deeper zoning, higher level, stricter protection.
**Zoning vs. classification mapping**: - High-level systems: place in LPZ2 or deeper; - Critical equipment: multi-stage SPDs across multiple boundaries; - General equipment: inside LPZ1 + boundary SPDs; - Classification determines zone depth and SPD stages.
**Code implementation**: - Set the system level before design; - Draw LPZ zones by level; - Configure boundary protection by level; - Verify protection completeness at acceptance.
Key insight: **"system classification → zone depth → SPD stages" is a consistent chain.** The code's classification is the "rating table" for zoned protection — set the level first, then draw the zones.
6. Product Landing: Intelligent Lightning-Protection On-Line Monitoring
FEXLINK products land zoned protection:
- **FSS Intelligent Surge Protective Device**: boundary SPDs at every stage (status indication + thermal disconnector); - **FS SPD Monitor**: SPD state and leakage trend (boundary-protection effectiveness); - Platform: SPD states at every stage + lightning events + trend analysis; - Zoned protection + monitoring verification — protection state visible.
Design principle in one sentence: **"zone by criteria, protect at every boundary, rate SPDs by level."** Clear zoning, complete boundary protection — surges diverted stage by stage, equipment safe.
7. Common Design Misconceptions
1. **Marking symbols without installing protection**: zones drawn, no boundary SPDs on site. Consequence: zoning is a formality. Correct: install SPD + bonding at every boundary. 2. **One-stage SPD to the end**: thinking one stage at the main board suffices. Consequence: energy not diverted stage by stage. Correct: staged installation + inter-stage coordination. 3. **Treating 0B as a safe zone**: assuming no risk under air-termination. Consequence: induction damage. Correct: 0B guards against induction (shielding + SPD). 4. **Zoning disconnected from classification**: drawing zones without system level. Consequence: mismatched protection levels. Correct: set the level first, then zone. 5. **Ignoring bonding**: installing only SPDs at boundaries. Consequence: potential-difference strikes. Correct: SPD + bonding together.
Scope and Limitations
This article explains the LPZ lightning-protection zoning basis (LPZ0A/0B/1/2) and boundary-protection requirements, applicable to lightning-protection design and construction-drawing review. Specific zone boundaries must follow building structure, air-termination arrangement, and shielding capability; SPD selection and inter-stage coordination require professional design per GB 50343/GB 50057 and other codes; system classification (A/B/C) determines protection depth. All cases are anonymized (a certain design institute/a certain park) and do not refer to any specific customer.