Choosing Equipotential Bonding Bars and Earth Busbars: Cross-Section and Bonding Points Matter

Direct Answer What crosssection should the equipotential terminal box in a server room or switch room have, an

2026-09-19 Smart Lightning Protection 微物联 5 min
Choosing Equipotential Bonding Bars and Earth Busbars: Cross-Section and Bonding Points Matter

Direct Answer

**What cross-section should the equipotential terminal box in a server room or switch room have, and which wires must it take? The answer: the cross-section of the equipotential busbar must be able to carry the bonded fault/lightning current (matched to the cross-section of the connected earthing main), and it must bond the building metal structure, the PE main, the shielding layers and the entering/exiting pipes on the same busbar. The key of selection is not the appearance, but whether the current-carrying capacity of the cross-section and the number of connection points cover all the metal bodies in this area that need bonding.**

At a server room, the equipotential terminal box had a too-small cross-section and only took the PE main, not the tray and the shielding: during a strike, the potential difference between the tray and the cabinets was large, and equipment was damaged. After matching the cross-section to the connected earthing main and bonding the tray/shielding/pipes to the same busbar, the problem disappeared. **The key distinction: an equipotential box is not an "ordinary junction box" — the cross-section handles the current-carrying capacity (matched to the earthing main), and the connection points handle potential equalization (covering all the metal bodies in this area); both are indispensable.**

Why:

- **Cross-section**: carries the bonded fault/lightning current, matched to the earthing main; - **Connection points**: cover the metal bodies to bond (structure/PE/shielding/pipes); - **Contact**: the connections are reliable and low-impedance; - **Location**: the main and local equipotential points are set as needed.

Key insight: **"Selection looks at two things: is the cross-section enough to carry, and are the connection points complete — treating it as an ordinary junction box means it is installed for nothing."**

At a switch room, a newly added cable tray was not connected to the equipotential busbar; during a strike, the tray potential was unequal to the equipment, arcing damaged it, and connecting the tray to the busbar fixed it. **Lesson: newly added metal bodies (trays/pipes/equipment enclosures) must be brought into the equipotential system in time — every missing connection point leaves a potential-difference risk.**

1. Matching the Busbar Cross-Section to the Earthing Main

Step one: how the cross-section is set.

**The role of the cross-section**: - Carries the bonded fault/lightning current; - The current equalizes and shunts through the busbar; - A too-small section → heating/melting; - It is the first indicator of selection.

**The matching basis**: - Matched to the cross-section of the connected earthing main; - Of the same order as the PE main/down-conductor; - Reference the standard minimum-section requirements; - Stricter for large-current scenarios.

**Material and corrosion protection**: - Mainly copper (good conductivity); - Tinned/galvanized for corrosion; - Stronger protection in humid environments; - The material affects contact and life.

Key insight: **"The cross-section is matched to the earthing main to carry the bonded current — too small means heating and melting; look at the carrying capacity first, not the appearance."**

2. The Types of Metal Bodies That Must Be Bonded

Step two: what the busbar must take.

**Building metal structures**: - Steel frames/column bars; - Slab reinforcement/exterior metal; - The structure is a natural equalization net; - It must connect to the busbar.

**The PE main**: - The protective earthing main; - The PE of each circuit; - Bonded at one point on the busbar; - Avoid multi-point earthing loops.

**Shielding layers**: - Cable shielding/trays; - The lightning shielding system (connecting to LPZ); - Shielding metal must be equipotential; - Prevents induced overvoltage.

**Entering/exiting pipes**: - Water/gas pipes/trays; - Metal pipes entering the area; - Bonded at the entrance; - Prevents "potential coming in through the pipes".

Key insight: **"The structure, PE, shielding and entering/exiting pipes — four types — must meet on the same busbar; missing one leaves a potential-difference channel."**

3. The Contact Reliability of the Connections

Step three: is it connected firmly.

**Connection methods**: - Bolted (removable, easy to maintain); - Welded (permanent, low resistance); - Crimped terminals/lugs; - Choose the method by the part.

**Contact requirements**: - Clean, unoxidized contact surfaces; - Enough tightening torque; - Low contact resistance; - Regular continuity checks.

**Common problems**: - Oxidized contacts → rising resistance; - Loose bolts → virtual connection; - Unremoved paint/oxide layers; - Unreliable connections → failed equalization.

Key insight: **"The connections must be reliably contacted and low-impedance — oxidation/looseness/virtual connections make the equalization nominal; test the continuity regularly."**

4. Where to Set the Main and Local Equipotential Points

Step four: where to install and how many.

**Main equipotential bonding (MEB)**: - Set at the building entry; - Summarizes all the building metal; - At the incoming switchgear; - The whole building's potential reference.

**Local equipotential bonding (LEB)**: - Server rooms/switch rooms/bathrooms, etc.; - Locally bonds the metal in the area; - Key for sensitive areas; - Connected to the main.

**Setting points**: - Set at the area entrance; - Reliably connected to the earthing system; - Independent local busbars in local areas; - Clear main-local hierarchy.

Key insight: **"The main handles the whole-building reference, the local handles sensitive areas — set them by area; do not mix the hierarchy."**

5. The Selection Check: Cross-Section, Connection Points, Material and Corrosion

Step five: how to check in practice.

**The checklist**: - ① The cross-section matches the earthing main, with enough carrying capacity; - ② The connection points cover all the metal bodies in this area; - ③ Good conductivity and adequate corrosion protection; - ④ Reliable connections, testable continuity; - ⑤ A clear main/local hierarchy.

**Common pitfalls**: - Selecting by the "junction box" mindset; - Too small a section and incomplete points; - Missing newly added metal bodies; - Unprocessed contact surfaces and virtual connections.

**Practice verification**: - Verify the connections by continuity testing; - Monitor online with the FR Earth-Resistance Monitor; - Recheck the equalization after strikes; - Bring new metal bodies into the system in time.

Key insight: **"Select with a checklist: enough section, complete points, good material, firm connections, clear hierarchy — only when all five pass is the selection right."**

6. Product Implementation: Equalization and Earthing as One

WeiWuLian products manage the equipotential system:

- **FR Earth-Resistance Monitor**: online earthing and equalization state; - **Continuity recheck**: continuity tests of the connection points; - **Strike-event correlation**: rechecking the equalization after strikes; - **Data loop**: digitizing the section/points/state.

The design principle in one sentence: **"Section by the main, complete connection points, reliable contact, clear hierarchy — manage the equipotential system with data."**

7. Common Misjudgments

1. **"Treat it as an ordinary junction box"**: ignoring the equalization role. Result: small section, incomplete points. Correct: match the main and cover the metal bodies. 2. **"Any section works"**: ignoring the carrying capacity. Result: heating and melting. Correct: match the main's section. 3. **"Missing the tray is fine"**: ignoring the potential difference. Result: arcing on a strike. Correct: bring new metal bodies in. 4. **"Connected and done"**: ignoring contact reliability. Result: virtual connection, failed equalization. Correct: test the continuity. 5. **"Mix the main and local"**: ignoring the hierarchy. Result: unclear reference. Correct: a clear main/local structure.

Scope and Limitations

This article explains the section matching, connection-point coverage, contact reliability, main/local equipotential settings and a selection checklist for equipotential terminal boxes and earthing busbars, applicable to selecting and understanding equipotential systems. The exact sections and layouts follow GB 50057-2010, GB 50343-2012 and their revisions; this article explains only the selection logic and judgment basis. All cases are anonymized (a server room, a switch room) and do not refer to any specific customer.

Want a deeper look at FEXLINK solutions?

Contact the FEXLINK solutions team for customised solutions and technical support.

Frequently Asked Questions

What cross-section does an equipotential bonding bar in a switch room need?

The cross-section must carry the bonded fault or lightning current, matched to the cross-section of the connected earthing main as GB 50057-2010 requires; check carrying capacity first, because an undersized bar heats and melts instead of equalising anything.

Which metal bodies must be brought onto the same equipotential busbar?

Four types converge on the busbar: structure, PE, shielding and the entering/exiting pipes; missing one leaves a potential-difference channel, which is why newly added trays, pipes or equipment enclosures must be bonded as soon as they are installed.

Why is a loose or oxidised connection treated as a defect even with a right bar?

Connections must be reliably contacted and low-impedance per GB 50343-2012; oxidation, looseness or a virtual connection makes the equalisation nominal, so a bar passes a visual check while the potential difference stays; test continuity regularly and judge on the reading.

When is a local bonding bar needed instead of relying on the main one?

The main bar handles the whole-building reference and the local bar handles sensitive areas, so set them by area under GB 50057-2010; do not mix the hierarchy, because routing a sensitive return through the main bar re-creates the loop the local bar was meant to break.

Do five checklist items have to pass before a busbar selection is accepted?

Yes: enough section, complete points, good material, firm connections and clear hierarchy, and only when all five pass is the selection right; the sections and layouts follow GB 50057-2010 and GB 50343-2012, so cite the checklist result and the standard together.