What cross-section should the equipotential terminal box in a server room or switch room have, and which wires must it take? The answer: the cross-section of the equipotential busbar must be able to c

2026-10-18 Smart Lightning Protection FEXLINK Research 8 min
Choosing Equipotential Bonding Bars and Earth Busbars: Cross-Section and Bonding Points Matter
Choosing Equipotential Bonding Bars and Earth Busbars: Cross-Section and Bonding Points Matter

Direct Answer

What cross-section should the equipotential terminal box in a server room or switch room have, and which wires must it take? The answer: the cross-section of the equipotential busbar must be able to carry the bonded fault/lightning current (matched to the cross-section of the connected earthing main), and it must bond the building metal structure, the PE main, the shielding layers and the entering/exiting pipes on the same busbar. The key of selection is not the appearance, but whether the current-carrying capacity of the cross-section and the number of connection points cover all the metal bodies in this area that need bonding.

At a server room, the equipotential terminal box had a too-small cross-section and only took the PE main, not the tray and the shielding: during a strike, the potential difference between the tray and the cabinets was large, and equipment was damaged. After matching the cross-section to the connected earthing main and bonding the tray/shielding/pipes to the same busbar, the problem disappeared. The key distinction: an equipotential box is not an "ordinary junction box" — the cross-section handles the current-carrying capacity (matched to the earthing main), and the connection points handle potential equalization (covering all the metal bodies in this area); both are indispensable.

Why:

- Cross-section: carries the bonded fault/lightning current, matched to the earthing main; - Connection points: cover the metal bodies to bond (structure/PE/shielding/pipes); - Contact: the connections are reliable and low-impedance; - Location: the main and local equipotential points are set as needed.

Key insight: "Selection looks at two things: is the cross-section enough to carry, and are the connection points complete — treating it as an ordinary junction box means it is installed for nothing."

At a switch room, a newly added cable tray was not connected to the equipotential busbar; during a strike, the tray potential was unequal to the equipment, arcing damaged it, and connecting the tray to the busbar fixed it. Lesson: newly added metal bodies (trays/pipes/equipment enclosures) must be brought into the equipotential system in time — every missing connection point leaves a potential-difference risk.

1. Matching the Busbar Cross-Section to the Earthing Main

Step one: how the cross-section is set.

The role of the cross-section: - Carries the bonded fault/lightning current; - The current equalizes and shunts through the busbar; - A too-small section → heating/melting; - It is the first indicator of selection.

The matching basis: - Matched to the cross-section of the connected earthing main; - Of the same order as the PE main/down-conductor; - Reference the standard minimum-section requirements; - Stricter for large-current scenarios.

Material and corrosion protection: - Mainly copper (good conductivity); - Tinned/galvanized for corrosion; - Stronger protection in humid environments; - The material affects contact and life.

Key insight: "The cross-section is matched to the earthing main to carry the bonded current — too small means heating and melting; look at the carrying capacity first, not the appearance."

2. The Types of Metal Bodies That Must Be Bonded

Step two: what the busbar must take.

Building metal structures: - Steel frames/column bars; - Slab reinforcement/exterior metal; - The structure is a natural equalization net; - It must connect to the busbar.

The PE main: - The protective earthing main; - The PE of each circuit; - Bonded at one point on the busbar; - Avoid multi-point earthing loops.

Shielding layers: - Cable shielding/trays; - The lightning shielding system (connecting to LPZ); - Shielding metal must be equipotential; - Prevents induced overvoltage.

Entering/exiting pipes: - Water/gas pipes/trays; - Metal pipes entering the area; - Bonded at the entrance; - Prevents "potential coming in through the pipes".

Key insight: "The structure, PE, shielding and entering/exiting pipes — four types — must meet on the same busbar; missing one leaves a potential-difference channel."

3. The Contact Reliability of the Connections

Step three: is it connected firmly.

Connection methods: - Bolted (removable, easy to maintain); - Welded (permanent, low resistance); - Crimped terminals/lugs; - Choose the method by the part.

Contact requirements: - Clean, unoxidized contact surfaces; - Enough tightening torque; - Low contact resistance; - Regular continuity checks.

Common problems: - Oxidized contacts → rising resistance; - Loose bolts → virtual connection; - Unremoved paint/oxide layers; - Unreliable connections → failed equalization.

Key insight: "The connections must be reliably contacted and low-impedance — oxidation/looseness/virtual connections make the equalization nominal; test the continuity regularly."

4. Where to Set the Main and Local Equipotential Points

Step four: where to install and how many.

Main equipotential bonding (MEB): - Set at the building entry; - Summarizes all the building metal; - At the incoming switchgear; - The whole building's potential reference.

Local equipotential bonding (LEB): - Server rooms/switch rooms/bathrooms, etc.; - Locally bonds the metal in the area; - Key for sensitive areas; - Connected to the main.

Setting points: - Set at the area entrance; - Reliably connected to the earthing system; - Independent local busbars in local areas; - Clear main-local hierarchy.

Key insight: "The main handles the whole-building reference, the local handles sensitive areas — set them by area; do not mix the hierarchy."

5. The Selection Check: Cross-Section, Connection Points, Material and Corrosion

Step five: how to check in practice.

The checklist: - ① The cross-section matches the earthing main, with enough carrying capacity; - ② The connection points cover all the metal bodies in this area; - ③ Good conductivity and adequate corrosion protection; - ④ Reliable connections, testable continuity; - ⑤ A clear main/local hierarchy.

Common pitfalls: - Selecting by the "junction box" mindset; - Too small a section and incomplete points; - Missing newly added metal bodies; - Unprocessed contact surfaces and virtual connections.

Practice verification: - Verify the connections by continuity testing; - Monitor online with the FR Earth-Resistance Monitor; - Recheck the equalization after strikes; - Bring new metal bodies into the system in time.

Key insight: "Select with a checklist: enough section, complete points, good material, firm connections, clear hierarchy — only when all five pass is the selection right."

6. Product Implementation: Equalization and Earthing as One

WeiWuLian products manage the equipotential system:

- FR Earth-Resistance Monitor: online earthing and equalization state; - Continuity recheck: continuity tests of the connection points; - Strike-event correlation: rechecking the equalization after strikes; - Data loop: digitizing the section/points/state.

The design principle in one sentence: "Section by the main, complete connection points, reliable contact, clear hierarchy — manage the equipotential system with data."

7. Common Misjudgments

1. "Treat it as an ordinary junction box": ignoring the equalization role. Result: small section, incomplete points. Correct: match the main and cover the metal bodies. 2. "Any section works": ignoring the carrying capacity. Result: heating and melting. Correct: match the main's section. 3. "Missing the tray is fine": ignoring the potential difference. Result: arcing on a strike. Correct: bring new metal bodies in. 4. "Connected and done": ignoring contact reliability. Result: virtual connection, failed equalization. Correct: test the continuity. 5. "Mix the main and local": ignoring the hierarchy. Result: unclear reference. Correct: a clear main/local structure.

Scope and Limitations

This article explains the section matching, connection-point coverage, contact reliability, main/local equipotential settings and a selection checklist for equipotential terminal boxes and earthing busbars, applicable to selecting and understanding equipotential systems. The exact sections and layouts follow GB 50057-2010, GB 50343-2012 and their revisions; this article explains only the selection logic and judgment basis. All cases are anonymized (a server room, a switch room) and do not refer to any specific customer.

FAQ

What cross-section should the equipotential terminal box in a server room or switch room have, and which wires must it take? The answer: the cross-section of the equipotential busbar must be able to c
What cross-section should the equipotential terminal box in a server room or switch room have, and which wires must it take? The answer: the cross-section of the equipotential busbar must be able to carry the bonded fault/lightning current (matched to the cross-section of the connected earthing main), and it must bond the building metal structure, the PE main, the shielding layers and the entering/exiting pipes on the same busbar. The key of selection is not the appearance, but whether the current-carrying capacity of the cross-section and the number of connection points cover all the metal bodies in this area that need bonding.

Want a deeper look at FEXLINK solutions?

Contact the FEXLINK solutions team for customised solutions and technical support.