Choosing Air Terminals: Rods, Strips and Meshes—Defining Protection Zone by the Rolling Sphere Method

Direct Answer Should the roof use a rod, a tape, or a mesh? The answer: the airtermination form follows the bu

2026-09-19 Smart Lightning Protection 微物联 5 min
Choosing Air Terminals: Rods, Strips and Meshes—Defining Protection Zone by the Rolling Sphere Method

Direct Answer

**Should the roof use a rod, a tape, or a mesh? The answer: the air-termination form follows the building outline — protruding parts (roof ridges, tower tops) use air-termination rods, flat roofs use air-termination tapes along the edges, and large or important roofs use air-termination meshes. The protection range is verified by the rolling-sphere method (taking the sphere radius by the lightning-protection class), ensuring protected objects do not fall outside the range — it is not "the higher the rod, the better".**

At a plant, a high rod was erected at the center of the roof following a drawing, ignoring a large roof-mounted unit on the far side of the ridge: by the rolling-sphere calculation, that unit lay outside the protection range, and it was struck twice in the storm season. After adding a tape along the ridge plus local protection for the unit, the problem disappeared. **The key distinction: air termination is not "the higher, the better" — the form is chosen by the building shape (rod/tape/mesh), the range is verified by the rolling sphere, and misses usually come from "copying the drawing without looking at the shape".**

Why:

- **Three forms**: the rod covers protrusions, the tape covers flat edges, the mesh covers large areas; - **The rolling sphere**: the radius is taken by the lightning-protection class; - **Protected objects**: must lie within the protection range; - **Special treatment**: protrusions/antennas/PV panels are verified separately.

Key insight: **"Choose the air-termination form by the building outline and verify the range by the rolling sphere — being high does not mean being protected; misses come from ignoring the shape."**

At a park, solar panels were added to the roof without re-verifying the air-termination coverage, and a strike damaged several modules. After re-calculating the rolling-sphere range for the panel positions and adding tapes, the damage did not recur. **Lesson: adding roof protrusions (PV/antennas) requires re-verifying the protection range — the old scheme does not automatically cover new objects.**

1. The Applicable Parts of the Three Air-Termination Forms

Step one: where the rod, tape and mesh go.

**Air-termination rod (mast)**: - For protruding parts: roof ridges, tower tops, water towers; - Single-point protection; the coverage is set by the height; - Priority on the highest protrusions; - Free-standing masts also work.

**Air-termination tape**: - For flat roofs: along ridges, eaves, parapets; - Laid along edges; line-type protection; - Large coverage, fitting the building; - The most common roof form.

**Air-termination mesh**: - For large/important roofs; - Laid in a grid; full coverage; - The mesh size follows the class; - For important buildings/special places.

Key insight: **"The rod covers protrusions, the tape covers edges, the mesh covers large areas — the form follows the building outline, not an arbitrary rod."**

2. The Rolling-Sphere Method and the Radius by Class

Step two: how the protection range is calculated.

**The rolling-sphere principle**: - A sphere of the rolling radius rolls along the ground; - It is tangent to the air terminations and the ground; - The zone inside the sphere is the protection range; - The untouched zone is the blind area.

**The radius by class**: - Class I: rolling radius 30 m; - Class II: 45 m; - Class III: 60 m; - The higher the class, the smaller the radius, the stricter the protection.

**The effect of the value**: - A smaller radius → a narrower range; - Class I is the strictest; - The higher the rod, the wider the single coverage but the easier to miss at the edges; - Taking the radius by class is key.

Key insight: **"The rolling sphere rolls along the ground and cuts out the protection range — the radius follows the class (I: 30 m, II: 45 m, III: 60 m); a higher class means stricter protection."**

3. How Protected Objects Fall within the Range

Step three: how to confirm the protection holds.

**The calculation steps**: - Determine the building's class (connecting to KD-0179); - Take the corresponding rolling radius; - Roll the sphere along the building outline; - See whether the protected object is inside.

**Common misses**: - A protrusion outside the rod's range; - No tape at the roof edges; - Too large a mesh on a big roof; - New objects not re-verified.

**How to confirm**: - Calculate by the range diagram; - Check every protected object point by point; - Add air terminations where there are blind zones; - Double-verify with software/diagrams.

Key insight: **"Every protected object must lie inside the sphere — check point by point and add where there are blind zones; 'roughly within range' is where misses happen."**

4. Special Treatment of Protrusions, Antennas and Solar Panels

Step four: what to do about new things on the roof.

**Types of protrusions**: - Antennas/lightning arresters/exhaust pipes; - Solar panels/PV supports; - Cooling towers/water tanks/decorations; - Protrusions higher than the tape.

**The treatment principles**: - Higher than the tape → add separate protection; - Solar panels are conductors → bring them into the air-termination system; - Antennas need side-flash/equipotential protection; - New protrusions must be re-verified.

**Common errors**: - Adding PV without re-verifying the range; - Protruding metal not connected to the down-conductor; - Insufficient clearance between antennas and the tape; - Believing "a rod on the roof covers everything".

Key insight: **"New roof protrusions (PV/antennas) must be re-verified and brought into the system — the old protection range does not automatically cover new objects."**

5. The Connection Requirements between Air Terminations and Down-Conductors

Step five: the air-termination → down-conductor → earthing chain.

**Connection requirements**: - Reliable connection between the air terminations and the down-conductors; - Multiple down-conductors for shunting (connecting to KD-0182); - Welded/mechanical reliability at the joints; - Electrical continuity and low impedance.

**Counterattack prevention**: - Keep the clearance between the down-conductors and protected objects; - Use equipotential bonding when it cannot be met; - The down-conductor potential is high when carrying current; - The whole system is continuously connected.

**Practice verification**: - Verify the connections by continuity testing; - Monitor online with the FR Earth-Resistance Monitor; - Recheck the connections after strikes; - Repair abnormalities in time.

Key insight: **"Air termination → down-conductor → earthing is one chain — reliable connection, electrical continuity, measurable continuity; a break in any link makes it all useless."**

6. Product Implementation: Air Termination and Earthing as One

WeiWuLian products manage the air-termination system:

- **FR Earth-Resistance Monitor**: online monitoring of the earthing system; - **Continuity recheck**: verifying the air-termination-down-conductor-earthing connections; - **Strike-event correlation**: rechecking the system after strikes; - **Data loop**: digitizing the range and the state.

The design principle in one sentence: **"Form by the outline, range by the rolling sphere, connection by continuity — close the three and manage the air-termination system with data."**

7. Common Misjudgments

1. **"The higher, the better"**: ignoring edge misses. Result: a protrusion outside the protection. Correct: choose the form by the shape and verify by the rolling sphere. 2. **"Copy the rod from the drawing"**: ignoring the building shape. Result: misses/waste. Correct: choose rod/tape/mesh by the outline. 3. **"Take any radius"**: ignoring the class. Result: insufficient protection. Correct: take the radius by the class. 4. **"No need to recheck after adding PV"**: ignoring new objects. Result: damaged modules. Correct: re-verify and add protection. 5. **"Connect it loosely"**: ignoring electrical continuity. Result: a broken chain, failed protection. Correct: verify by continuity testing.

Scope and Limitations

This article explains the applicable parts of the three air-termination forms (rod/tape/mesh), rolling-sphere range calculation, protected-object confirmation, special treatment of protrusions, and the connection requirements with down-conductors, applicable to air-termination selection and range calculation. The exact rolling radii and layouts follow GB 50057-2010 and its revisions; this article explains only the selection logic and calculation method. All cases are anonymized (a plant, a park) and do not refer to any specific customer.

Want a deeper look at FEXLINK solutions?

Contact the FEXLINK solutions team for customised solutions and technical support.

Frequently Asked Questions

Should a roof use an air-termination rod, a tape or a mesh?

Rods serve protrusions such as ridges and tower tops, tapes follow flat-roof edges and parapets, and meshes cover large or important roofs; with Class I at 30 m, Class II at 45 m and Class III at 60 m, the form follows the outline and every protected object is checked against the sphere.

How is the rolling-sphere radius set for each lightning-protection class?

Class I takes a 30 m rolling radius, Class II 45 m and Class III 60 m, so a higher class means a smaller radius and a stricter range; the radius is taken from the building class before the sphere is rolled along the outline and each protected object is checked for blind zones.

Why did a high roof rod still leave a unit struck twice in one storm season?

The rod stood at the roof centre while a large unit beyond the ridge stayed outside the rolling-sphere range, so that unit lay exposed and was struck twice in the storm season; the fix was a tape along the ridge plus local protection, judged per object rather than per rod height.

Which roof additions require re-verifying the air-termination protection range?

Solar panels, antennas and other protrusions above the tape require re-verification, since a park added PV panels without recalculating the range and a strike damaged several modules; new objects are brought into the air-termination system, so the old scheme is not assumed to cover them.

How should the air-termination to down-conductor to earthing path be verified?

Reliable connection, electrical continuity and measurable continuity tie the three links into one chain, so the design is judged by continuity testing and rechecks after strikes; the FR Earth-Resistance Monitor then watches the earthing online across a 0.01-2000 Ohm range.