Direct Answer
A drawing says "Class Two lightning-protection building" — how is this class determined, and which measures does it require? The answer: GB 50057 classifies buildings into Class Three, Class Two and Class One lightning protection by the building importance, use nature and the annual expected strike count N; the higher the class, the more severe the consequences; different classes correspond to different rolling-sphere radii, air-termination/down-conductor densities, earth-resistance requirements and SPD configuration levels — the class decides the measure magnitude, not one-size-fits-all practice.
A design drawing marked "Class Two building" was built with Class Three practices — sparser air-termination meshes and lower SPD levels. It was corrected after checking the class basis against the measure magnitude. The key distinction: the class is not "set by feeling" but calculated from the importance, use nature and N — the higher the class, the larger the measure magnitude; the class decides the measures, not one identical practice.
Why:
- The basis: importance, use nature and N;
- The rolling-sphere radius: the higher the class, the smaller the radius and the denser the air termination;
- The measure magnitude: earth resistance and SPD levels upgrade with the class;
- The upgrade rule: flammable/explosive and dense-population buildings take the higher.
Key insight: "The class decides the measure magnitude — GB 50057 sets the class by importance, use nature and N; the rolling-sphere radius/air-termination density/earthing/SPD upgrade with the class; not one identical practice."
A storage project was Class Three by N, but upgraded to Class Two for storing flammable/explosive goods, with the air termination and SPDs completed to Class Two. Lesson: the class is decided by the basis plus the upgrade rule — looking only at N without the nature may set the wrong class, and the measures follow it wrong.
Overview: run "class basis → class → measure magnitude" as a checkable comparison table. The three classes of GB 50057 are not three parallel practices but one ascending chain: Class One the strictest (high-risk like flammable/explosive), Class Two the middle (dense-population/important buildings), Class Three the loosest (ordinary buildings). How the class is set and what it requires come from the same logic — the importance, use nature and N decide the class, and the class decides the rolling-sphere radius, air-termination density, down-conductor density, earth resistance and SPD levels. The five steps below expand: the three-class basis, the class vs rolling-sphere radius/air-termination density, the class vs earth resistance/SPD levels, the upgrade of flammable/explosive and dense-population buildings, and how to check the class against the measures in design review.
The order of N and the nature: in judging the class, the nature and N are not parallel alternatives but "nature first, N as a supplement". The scenarios where the nature directly sets the class: buildings storing flammable/explosive goods or with explosive-hazard environments go Class One directly — this judgment needs no N calculation, because the nature itself says the consequences are extremely severe; dense-population or important-function buildings (hospitals, schools, stadiums, large malls) take the higher, usually starting from Class Two. When the nature cannot set the class, N supplements: ordinary buildings set Class Two or Class Three by N reaching a certain value. The judging rhyme: first ask "is it flammable/explosive or dense-population" — yes, upgrade by the nature; no, then compute N. N and the nature: "nature first, N as a supplement" — flammable/explosive goes Class One directly, dense-population from the higher; what the nature cannot set is computed by N.
1. The Three-Class Basis
Step one: how the class is set.
The three judging dimensions:
- The building importance (important/ordinary);
- The use nature (flammable/explosive/dense-population/general);
- The annual expected strike count N (the risk probability).
The class correspondence:
- Class One: high-risk like flammable/explosive;
- Class Two: dense-population/important buildings;
- Class Three: ordinary buildings (N reaching a value).
The judging order:
- The nature first (flammable/explosive or dense-population?);
- Then N (the strike probability);
- The nature + N set the class together;
- Not just one dimension.
Key insight: "The class is set by three dimensions together — importance, use nature and N; the nature first, then N; flammable/explosive and dense-population upgrade directly; not just one dimension."
2. The Class vs Rolling-Sphere Radius / Air-Termination Density
Step two: how the class decides the air termination.
The rolling-sphere radius:
- Class One the smallest (strictest);
- Class Two the middle;
- Class Three the largest (loosest);
- The radius decides the protected zone.
The air-termination density:
- The higher the class, the denser the mesh;
- The strips/meshes denser;
- The coverage fuller;
- The down-conductor spacing shorter.
The measure meaning:
- The air-termination mode per class;
- The density upgrades with the class;
- The coverage expands with the class;
- The air termination is the first line.
An intuitive view of the air-termination protection: the rolling-sphere radius can be understood as "a ball of a fixed radius rolls along the building surface; where the ball cannot touch is the protection blind zone". The smaller the radius, the fewer places the ball can roll, the stricter the protection — which is why Class One has the smallest radius and the densest mesh. In engineering this corresponds to the mesh size: the higher the class, the smaller the mesh edge length of the strips/meshes (Class One the densest, Class Three the largest); the down conductors likewise — the higher the class, the shorter the spacing and the more the conductors. When checking a drawing, look at three places first: whether the mesh size matches the class, whether the down-conductor spacing matches, and whether the protected zone covers all protruding objects (roof equipment, chimneys, antennas, etc.). The rolling-sphere radius = the strictness — a small radius means strict protection and dense meshes; checking a drawing starts with the mesh size, the down-conductor spacing and the protruding-object coverage matching the class.
Key insight: "The class decides the air-termination magnitude — the radius Class One the smallest and Class Three the largest; the mesh and down-conductor densities upgrade with the class; the coverage fuller."
3. The Class vs Earth Resistance / SPD Levels
Step three: how the class decides the earthing and SPDs.
The earth resistance:
- The higher the class, the stricter the requirement;
- Class One the strictest, Class Three the loosest;
- The electrode arrangement denser with the class;
- The earthing is the discharge end.
The SPD levels:
- The higher the class, the fuller the stages;
- The main inlets T1 stricter;
- The signal paths per interface (relating to KD-0196);
- Capacity/residual per boundary.
The monitoring support:
- The FS/ESM for every stage;
- High-class/important points monitored online;
- Degradation known early (relating to KD-0161);
- The measure magnitude includes monitoring.
Key insight: "The class decides the earthing and SPD magnitude — the resistance Class One the strictest, the SPD stages fuller with the class; FS/ESM online monitoring as the support; the magnitude includes monitoring."
4. The Upgrade of Flammable/Explosive and Dense-Population Buildings
Step four: what goes up.
The flammable/explosive upgrade:
- Storing flammable/explosive goods goes Class One directly;
- Oil depots/gas stations/chemical plants stricter;
- The upgrade ignores N;
- The nature sets the class directly.
The dense-population upgrade:
- Hospitals/schools/stadiums take the higher;
- Important-function buildings upgraded;
- Severe consequences take the higher;
- Personnel safety first.
The meaning of the upgrade:
- The same building may go up a class;
- An upgrade = all measures upgraded;
- The cost is more investment;
- The value is lower risk.
Key insight: "Flammable/explosive goes Class One directly, dense-population from the higher — the upgrade ignores N; the nature sets the class directly; an upgrade = all measures upgraded, cost for lower risk."
5. Checking the Class Against the Measures in Design Review
Step five: how to keep the drawing on track.
The three checks:
- One, the class basis (is the nature + N computed right);
- Two, the measure magnitude (do the air termination/earthing/SPD match the class);
- Three, the monitoring support (important points online).
Common deviations:
- The class set but the measures configured lower;
- N checked but not the nature;
- Upgraded buildings without upgraded measures;
- The drawing detached from the class.
The checking tool:
- The class↔measure comparison table;
- Every measure traceable to the class;
- Review item by item;
- Deviations corrected on the spot.
Key insight: "Review in three steps: the class basis, the measure magnitude, the monitoring support — the class↔measure table checked item by item, deviations corrected on the spot; the drawing stays on track."
6. Product Implementation: Configure to the Class, up to the Monitoring
WeiWuLian products configure the three-class measures in place:
- FS/ESM SPD Monitor: the SPD states of every stage online;
- Per-class configuration: air termination/earthing/SPD strictly matched to the class;
- Closed-loop monitoring: degradation early + event review;
- Review support: the class↔measure comparison.
The design principle in one sentence: "The class is set by the nature + N, the measure magnitude follows the class — air termination/earthing/SPD configured per class, FS/ESM online; review item by item, never off track."
7. Common Understanding Misjudgments
- "The class set by feeling": ignoring the basis. Result: wrong class. Correct: compute the nature + N.
- "Class One practices applied to Class Three": ignoring the magnitude. Result: insufficient protection. Correct: configure per class.
- "N only, not the nature": ignoring the upgrade. Result: flammable/explosive set too low. Correct: the nature first.
- "Air termination enough": ignoring the earthing/SPDs. Result: no discharge place. Correct: configure the whole chain.
- "The drawing detached from the class": ignoring the check. Result: acceptance off track. Correct: review item by item.
Scope and Limitations
This article interprets the basis and required measures of the three lightning-protection classes of GB 50057-2010 (the class basis, the rolling-sphere radius/air-termination density, the earth resistance/SPD levels, the upgrade rules, the review check), applicable to design review and measure checking. The specific clauses follow the original text of GB 50057-2010; this article explains only the classification logic and the comparison method. All cases are anonymized (a storage, a design drawing) and do not refer to any specific customer.
Frequently Asked Questions
GB 50057's Three Lightning Protection Classes
GB 50057 classifies buildings into Class Three, Class Two and Class One lightning protection by the building importance